straight Edge
Greenlighter
- Joined
- Feb 22, 2014
- Messages
- 2
hey all,
Quick question I couldn't find an answer to. Say swim had 2 pipes used to smoke rock, and wanted to combine the resent from the 2 into one, what would be the best way to go about it? just scrape tem and mix it together? Or do a push in one, then take the chore and push in the second? thoughts?
also, how big/ long should the chore be in the stem? and should it be easy to pull through or hard? sometimes Swims hits are short because the pipe gets so hot so quick.
Thanks ahead of time!
Quick question I couldn't find an answer to. Say swim had 2 pipes used to smoke rock, and wanted to combine the resent from the 2 into one, what would be the best way to go about it? just scrape tem and mix it together? Or do a push in one, then take the chore and push in the second? thoughts?
also, how big/ long should the chore be in the stem? and should it be easy to pull through or hard? sometimes Swims hits are short because the pipe gets so hot so quick.
Thanks ahead of time!